Difference between revisions of "Project Management"

From RBI-T-WINNING
Jump to: navigation, search
Line 11: Line 11:
 
The project tasks are grouped in five work-packages, listed here with the current coordinators for each work-package:
 
The project tasks are grouped in five work-packages, listed here with the current coordinators for each work-package:
 
* WP1 (Updating knowledge) :  Predrag Lazić (DTP)
 
* WP1 (Updating knowledge) :  Predrag Lazić (DTP)
* WP2 (Strengthening the Research capabilities) : Kornelija Passek-Kumerički (DTP)  (former, B. Melić)
+
* WP2 (Strengthening the Research capabilities) : Kornelija Passek-Kumerički (DTP)   
 
* WP3 (Regional Impact) : Larisa Jonke (DTP)
 
* WP3 (Regional Impact) : Larisa Jonke (DTP)
* WP4 (Dissemination): Vinko Zlatić (DTP)
+
* WP4 (Dissemination): Vinko Zlatić (DTP) (former, B. Melić)
 
* WP5 (Project management) : Project Coordinator (F. Nesti), and PMB
 
* WP5 (Project management) : Project Coordinator (F. Nesti), and PMB

Revision as of 16:13, 22 July 2016

To simplify the management overhead and avoid the risk of clashes, common in multi-participant projects, we will ask the leading members of the participant institutions to form a Project Management Board (PMB). It is intended to be the main executive and decision making body of the RBI-T-WINNING project, assisting the Project Coordinator. It will contain one member representing each institution. This structure is designed in order to enable the centers of excellence to provide input and feedback through it, in addition to the tasks described in the Consortium Agreement such as revision of the Grant Agreement, such as node removal/addition, etc. Circulation of the ongoing project status to all the institutions and groups is intended to increase the transparency of the management and thus to reduce at minimum the risks of conflicts.

To ensure the smooth implementation of the project an Administrative assistant is hired on the direct costs of the project.

Finally, in order to reduce the risk of shortage of management resources at the main RBI (DTP) node, the project coordinator will be assisted by a Project Manager Kornelija Passek-Kumerički (DTP). (former, Vinko Zlatić)

Members of the PMB are: Fabrizio Nesti (DTP, Project Coordinator), Kornelija Passek-Kumerički (DTP, Project Manager), Z. Crljen (DTP director), S. Descotes-Genon (LPT), P. Salucci (SISSA), D. Lust (LMU), K. Sneppen (NBI).
PMB Contacts.

(see also Consortium Agreement)

The project tasks are grouped in five work-packages, listed here with the current coordinators for each work-package:

  • WP1 (Updating knowledge) : Predrag Lazić (DTP)
  • WP2 (Strengthening the Research capabilities) : Kornelija Passek-Kumerički (DTP)
  • WP3 (Regional Impact) : Larisa Jonke (DTP)
  • WP4 (Dissemination): Vinko Zlatić (DTP) (former, B. Melić)
  • WP5 (Project management) : Project Coordinator (F. Nesti), and PMB